Location: Tifton, Georgia

Client: Lennox Corporation

Project Description: At the time, this negotiated project was LRA’s largest ever contract. The 318,464 facility includes 8,000 square feet of office space and 310,464 square feet of manufacturing space. The facility, which was built adjacent to the client’s existing facility, is a pre-engineered metal building with a 40’ eave height. The facility includes a complete fire sprinkler system, fully conditioned space and industrial grade electrical system. The facility utilized a foamed standing seam metal roof system. LRA self performed all foundation work and metal building erection and completed the project ahead of schedule in 9 months.

Related Projects